Scope of work for drywall skim coat
Scope of work for drywall skim coat





scope of work for drywall skim coat
  1. #Scope of work for drywall skim coat install#
  2. #Scope of work for drywall skim coat Patch#
  3. #Scope of work for drywall skim coat code#

#Scope of work for drywall skim coat install#

Install MTI Floor Edging drainage board, Hydro Channel Plus, Drain-Eze or approved equal to ensure accumulated water has direct path to draintile system. Saw cut and demo concrete basement floor perimeter, excavate perimeter, install interior draintile, rock bed, and drill weep holes at block bottom course.

#Scope of work for drywall skim coat Patch#

Scrape loose texture, tape, sand and patch and prime area. Repair damaged drywall ceiling around the fireplace chimney on the main level.Re-build leaking water spigot located under the solar heat collectors.Ensure chimney flue top storm collars and rain caps are intact and sealed. Check and repair chimney roof penetration, tuck-point masonry, clean and apply masonry sealer to the chimney structure, repair flashings to ensure no leaks.Install new interior casing and repair exterior and interior finishes affected by this work. Seal penetrations and insulate rough openings. Install waterproof ground cover and restore / extend landscape planting bed in this area. Re-grade area where planter is removed to ensure positive drainage.Install new wrought iron guardrail and handrail. After form removal, apply a concrete resurfacer to the entire stair and landing with light broom finish. Form and pour steps, using dowels, and bonding agent. Remove loose or damaged concrete from existing steps, remove carpet and glue from top. Repair concrete front entry landing and steps.NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL.Contractor will repair any damage to the property or structure created by the scope of work.Contractor is responsible for a thorough investigation of the scope of work.Contractor will secure all permits and fees.Include such equipment or materials identified in the pre-bid conference. Contractor must reconnect all utilities, service panel or service feed.All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property.

#Scope of work for drywall skim coat code#

It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the International Residential Code (IRC), and Mille Lacs Band of Ojibwe 2016 MLB Project Specification Book.

scope of work for drywall skim coat

Bids received will be opened and qualified by the Mille Lacs Band of Ojibwe on Thursday July 21st, 2022 at 10:00 AM.Ī mandatory Pre-Bid site visit will be held Friday July 8th, 2022 at 10:00am at the site project address listed above. Bids will be due Wednesday July 20th 2022 at 3:00 PM. The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed lump sum bids for a residential renovation at 1720 S.







Scope of work for drywall skim coat